Case Study for a Dairy Major
Client: Dairy Major
Appliance / Equipment : Air Heating Equipment for Milk Product Plant
Problems:
Very low thermal efficiency
Soot and clinker formation on burner head
Fouling and periodic breakdown of equipments
Problem Studied (‘As is’ basis)
Evaluated the stack losses and its recent contribution to loss
System evaluated and performance checked off, installed indigenous burners and heating system for fuel study
Heat exchanger capacity evaluation
Solution
Suggested the adequate and efficient operation system for fuel oil heating with respect to available fuel oil.
Burner performance enhancing by replacement of energy efficient burner with additional control and safeties
Feasibility Study
Project cost estimate for performance enhancement and implementing suggested solutions
Suggested estimate of pay back period